Loading study pack…
Loading study pack…
Loading topic preview…
6 building blocks · blurt the topic, then mark it block by block against the answer key.
Topic preview
Preview the first part of the topic. Unlock SQE2 Playbook to answer prompts, get marked against the answer key, repair gaps, and carry the topic into review.
6 of 6 shown
Draft the TP1 property entry for Plot 3 forming part of registered title WM 701104 and shown edged red on the plan numbered OAK-3 attached to the transfer.
Plot 3 needs access to the public highway over the retained estate road shown brown. Draft a right for the transferee and successors to pass and repass at all times with or without vehicles for access to and from Plot 3, subject to causing no unnecessary obstruction.
Draft a right for Plot 3 to use and connect into water, electricity and telecommunications media within the retained land, with access on reasonable notice to inspect, repair and renew them and an obligation to make good damage.
The transferor retains adjoining land and needs access across Plot 3 to inspect and repair the retained boundary wall. Draft the reservation for reasonable daytime access on at least 48 hours' notice, except emergency, with minimum disturbance and repair of damage.
Draft a transferee covenant to pay 20% of the reasonable cost properly incurred in maintaining the private estate road, payable within 20 Business Days after receiving a written demand with supporting invoices.
Draft the operative TP1 provisions for transfer of Lot 2 from title NT 550072, edged red on plan L2, granting pedestrian and vehicle access over the green drive, reserving service access to pipes crossing Lot 2 on 24 hours' notice, prohibiting commercial use and requiring a one-quarter contribution to shared-gate maintenance supported by invoices.
New to the method? See why Paper Tiger beats rereading