A defendant filing its defence today seeks contribution from a co-defendant already in the proceedings for the same property damage. State the correct Part 20 document route and the permission position.
Clause 7 of a subcontract requires the subcontractor to indemnify the contractor for third-party loss caused by the subcontractor's defective work. Draft the Part 20 indemnity allegation where defective wiring caused the main claimant's loss.
The main defendant denies liability but seeks relief from the Part 20 defendant if and to the extent the court finds the main defendant liable. Draft the contingent opening without admitting the main claim.
The Part 20 claimant primarily seeks contractual indemnity but alternatively says the Part 20 defendant should bear 70% of any common liability. Draft the alternative relief paragraph.
A Part 20 defendant denies responsibility for a fire but says any contribution should not exceed 15% because the Part 20 claimant controlled the site and ignored two warnings. Draft the alternative defence paragraph.
A defendant in a professional-negligence claim seeks contribution from an architect already joined as co-defendant. The additional claim is served with the defence, alleges that the architect approved a defective drainage design and seeks 60% of any liability. Draft a three-paragraph contribution notice identifying roles, the contingent basis and the proposed share, plus costs.