Loading study pack…
Loading study pack…
Loading topic preview…
6 building blocks · blurt the topic, then mark it block by block against the answer key.
Topic preview
Preview the first part of the topic. Unlock SQE2 Playbook to answer prompts, get marked against the answer key, repair gaps, and carry the topic into review.
6 of 6 shown
A written agreement dated 6 May 2026 between Apex Catering Ltd and Green Hall Ltd required Apex to provide 300 meals at GBP 24 each on 20 June. Draft the opening contract paragraph for particulars of claim.
An oral variation was agreed at a meeting on 9 July 2026 at 14 King Street. Nina Cole for the defendant told Omar Reed for the claimant, 'Delivery may be on 18 July at the same price,' and Omar agreed. Draft the material variation paragraph.
A repairer was required to replace a motor and test the safety cut-off. It fitted a refurbished motor instead of the agreed new unit and performed no cut-off test. Draft a short general breach allegation followed by two particulars.
Because a supplier delivered unsafe shelving, the claimant closed one aisle for two days and paid GBP 2,900 for emergency removal. The claimant has no evidence of wider lost sales. Draft the causation and loss paragraph without claiming unsupported revenue loss.
A County Court debt claim seeks statutory interest under section 69 on GBP 10,000 at 8% from 1 January to issue on 31 March, calculated at GBP 197.26 and continuing at GBP 2.19 per day. Draft the interest paragraph using only those supplied figures.
A homeowner sues Blue Ridge Surveying Ltd for a negligent pre-purchase survey. The survey dated 4 April failed to report visible roof movement; the claimant completed the purchase on 30 April in reliance on it and paid GBP 26,000 for necessary stabilisation. Draft three pleading sections covering the retainer and duty context, factual breach, reliance/causation and loss, with damages, statutory interest and costs sought.
New to the method? See why Paper Tiger beats rereading