Loading study pack…
Loading study pack…
Loading topic preview…
6 building blocks · blurt the topic, then mark it block by block against the answer key.
Topic preview
Preview the first part of the topic. Unlock SQE2 Playbook to answer prompts, get marked against the answer key, repair gaps, and carry the topic into review.
6 of 6 shown
Acting for Cedar Design Ltd in a proposed contract claim against Vale Interiors Ltd, draft a two-sentence introduction identifying the parties and making clear that the document is an open letter before claim under the general pre-action practice direction.
A written supply contract required 80 pumps by 12 May 2026. The supplier delivered 50 on 12 May and the remaining 30 on 26 May. Draft one concise letter-before-claim paragraph stating the obligation and breach without reciting evidence.
The claimant paid GBP 12,000 for replacement goods and received a GBP 3,500 credit from the defendant. Draft the money-demand paragraph showing the net principal claimed, while reserving a separately evidenced interest claim.
A negligence claim concerns a loading-bay collision on 18 June. Draft a proportionate request for the defendant's incident report, relevant CCTV and the operative loading procedure, including preservation of the CCTV without demanding every safety document held by the business.
For a moderately complex GBP 85,000 professional-services dispute, the claimant proposes a one-day mediation and seeks a substantive response in 28 days. Draft the closing paragraph stating the proposal, response date and matters the defendant should address.
A restaurant alleges that a neighbouring contractor negligently severed its water supply for three days. Draft a three-section letter before claim using the confirmed excavation date, contractor identity, GBP 4,800 emergency works invoice and GBP 7,200 evidenced closure loss. Request the site plan and incident report, propose an early neutral evaluation and require a response within 21 days.
New to the method? See why Paper Tiger beats rereading